Jump to content

Forge Reliability: Building A Predictive Maintenance Program That Reduces Downtime: Revision history

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

16 April 2026

  • curprev 05:1005:10, 16 April 2026 TanyaLanders8 talk contribs 1,234 bytes +1,234 Created page with "<br>Unplanned downtime often comes from repeating equipment issues that are not detected early or not addressed with a consistent strategy. A strong PdM program usually starts by identifying critical equipment, building inspection routes and establishing baselines for condition monitoring measurements. Vibration analysis can detect imbalance, misalignment and bearing wear, while infrared thermography can reveal electrical and mechanical hot spots. Ultrasound inspections..."